Communications
- Covered Circuit. The Battalion received the three KY-8’s from repair and they are in operation at this time.
- Critical Shortage. A shortage still exists in (AN/PRC-25) spare module replacements. The most critical module shortage is (A-10).
- Equipment Repaired. During the month of May the following equipment has been repaired by first and second echelon.
- RT-505 receiver transmitter – 13
- PPS-6 radar set – 3
- PPS-5 radar set – 2
- EE-8 telephone – 4
- TA-312 telephone – 4
- H-138 radio handset – 6
- H-139 radio handset – 3
- H-33 radio handset – 4
- AN/GRA-39 radio – 2